top of page

Working Bee - Saturday 31 August 2024

Updated: 13 hours ago



Reminder about our next working bee on Saturday 31 August 2024 from 9am at the Coolamatong Range.


The list of jobs we are hoping to undertake are below:


HIGH PRIORITY


1. Mowing and Whipper snipping

Requirements:

  • Mowers and whipper snippers


MEDIUM PRIORITY


1. Staple removal from target frames and backing boards and/or replacement of backing boards

Requirements:

  • Battery powered angle grinder is recommended for this (Hearing protection required)

  • Alternatively, manual staple removers are available

  • Battery powered drill/screwdriver


2. Filling of wombat and rabbit holes around toilet block, water tanks and western side of buildings and on the range and mounds.

Requirements:

  • Wheelbarrow (on site)

  • Bags of cement (on site)

  • Water (on site)


3. Relocating IPSC fencing barricades from inside shed to outside and install fittings to secure.

Requirements:

  • Lifting

  • Eyelets for fitting to shed wall and Ratchet straps to secure fencing.


4. Inspect condition of the range perimeter fencing signs.

Requirements:

  • Replacement signs as required.


LOW PRIORITY


1. General Maintenance and Cleaning

Requirements:

  • Brooms, cobweb brooms, dust pans, shop wet/dry vacuums

  • Cleaning rags

  • Petrol garden blower (one on site)

  • Pressure cleaner


 

Hope to see you all there!


Please register your intention to attend using the button below.






Comments


bottom of page